Nov 17 2014

Matlock 16/11/2014 Report

Published by at 2:24 pm under Derwent,Unstructured

Date 16/11/2014
River Derwent
Level 0.98
Grade G1/2
Put In Darley Bridge
Take Out Slalom Course
Paddlers Phil Miller (L’Edge), Dave Marshall (Big Dog), Sally Vetta/Frances (Blast)
Training Objectives Unstructured (last of this type I hope)
Notes

Higher water than we have seen on this stretch recently. Pushing along quite quickly.

Steel Railway Bridge – all routes open, no blockages

Broken Weir – faster than usual, eddy lines strong, some good diagonals formed river left to right. Played at crossing the flow (S’s), fell in crossing a powerful eddy line with the wrong edge engaged, Leaky drysuit doesn’t help.

Town Bridge – all channels open, took the left as usual, felt easier than in low water because of the lack of rocks mid-stream. Sally appeared with Frances in the two up blast. Played in the fuller flow middle and left jets

Stone Railway Bridge – both channels good flow, very good wave on left channel for crosses, break in/out

Artist’s Corner Play Wave -

Slalom Course – Turtle Rock not visible, tripped up exiting the wave which was formed behind turtle rock. Low brace failed (needs work).

Still apprehensive paddling.

No responses yet

Trackback URI | Comments RSS

Leave a Reply

Bad Behavior has blocked 2 access attempts in the last 7 days.